The State Environmental Fund of the Czech Republic oversees key energy-saving subsidy programs, led by the flagship Nová Zelená Úsporám (New Green Savings) project. In addition to administering billions in subsidies, the fund manages the entire digital agenda associated with submitting and processing applications.
The ultimate requirement for the subsidy portal is guaranteed high availability and readiness for extreme spikes in public interest. A cloud solution from MasterDC met these strict standards, providing the system with the necessary performance, stability, and high level of security.
According to initial plans, the core application for the State Environmental Fund’s New Green Savings program was to be hosted on the client’s own dedicated server. However, such a setup would not have met the demands for high performance, availability, and seamless scalability. The application for submitting requests within a time-limited window must be capable of serving up to ten thousand visitors simultaneously – and even more if needed.
“The priority was virtually unlimited performance, which only the cloud could offer us,” says Eduard Hlava from Neternity.cz, the company that developed and delivered the application for the state fund.
Projects experiencing extreme traffic spikes require an architecture capable of responding instantly to current system demands. For this reason, we built the infrastructure for the New Green Savings portal on a MasterDC cloud solution. Thanks to the cloud, New Green Savings easily withstood the initial onslaught of applicants – a feat that no traditional dedicated server could have guaranteed.
Before launching live application submissions, it was critical to verify how the system would behave under heavy load. To achieve this, we first deployed the cloud server in a test environment. This allowed the development company, Neternity.cz, to run trial operations and conduct rigorous load testing, confirming that the infrastructure was fully prepared to meet the project's demanding requirements.
From day one, we have been continuously monitoring live operations and fine-tuning the configuration based on real-world performance data. We handle regular updates, deploy security patches, and respond to incidents 24/7. This proactive care ensures that the platform remains consistently stable and secure.
“We chose MasterDC cloud hosting partly due to the widespread reputation of their data center quality and the technical specifications of the proposed solution. However, our decision was driven primarily by MasterDC’s exceptional approach and the sheer speed with which they handled our requirements.”
Eduard Hlava
Neternity.cz, za projekt aplikace Nová zelená úsporám
Managed by the State Environmental Fund, the New Green Savings subsidy program primarily focuses on home insulation, window replacements, and eco-friendly energy solutions. Homeowners can receive up to 55% funding for insulation projects and up to a 75% subsidy for transitioning to green energy sources, with higher incentives awarded to those combining multiple energy-saving measures. For this specific phase of the program, a total budget of CZK 1.9 billion was allocated to applicants, running from April 1, 2014, until the funds were fully drawn.